Practice Elementary Calculations - 5 | Module 7: Electrical Installations, Safety, and Energy Management | Basics of Electrical Engineering
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

5 - Elementary Calculations

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

Calculate the energy consumption for a 200W bulb running for 5 hours.

💡 Hint: Convert watts to kilowatts first.

Question 2

Easy

What is the primary role of capacitor banks in electrical systems?

💡 Hint: Think about the relationship between inductive loads and power factor.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the formula for calculating energy consumption?

  • Energy = Power × Time
  • Energy = Time / Power
  • Energy = Power / Time

💡 Hint: Think about how energy differs from power.

Question 2

True or False: Capacitors can improve a lagging power factor.

  • True
  • False

💡 Hint: Consider the function of capacitors in AC systems.

Solve 1 more question and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

A facility runs on a load of 800kW with a PF of 0.85. If the utility demands a PF of 0.95, what reactive power needs correcting?

💡 Hint: Use cos^-1(PF) to find angles.

Question 2

A battery bank has a total rating of 200Ah at 48V. If it supports a 600W load while maintaining 0.8 DoD and 85% efficiency, calculate the backup duration.

💡 Hint: First calculate the usable capacity using the DoD.

Challenge and get performance evaluation