Practice T500 Time (Flow time to reach 500 mm) - 4.2 | 23.Definition of Self-Compacting Concrete (SCC) | Civil Engineering Materials, Testing & Evaluation - Vol 2
Students

Academic Programs

AI-powered learning for grades 8-12, aligned with major curricula

Professional

Professional Courses

Industry-relevant training in Business, Technology, and Design

Games

Interactive Games

Fun games to boost memory, math, typing, and English skills

T500 Time (Flow time to reach 500 mm)

4.2 - T500 Time (Flow time to reach 500 mm)

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions

Question 1 Easy

What does T500 time measure in SCC?

💡 Hint: Think about how we evaluate flow characteristics.

Question 2 Easy

What is the ideal T500 time range?

💡 Hint: Recall the acceptable limit we discussed.

4 more questions available

Interactive Quizzes

Quick quizzes to reinforce your learning

Question 1

What does T500 Time refer to?

Time to cure SCC
Time to flow 500 mm
Setting time for concrete

💡 Hint: Consider what aspect of concrete flow this time represents.

Question 2

True or False: A lower T500 time indicates higher viscosity.

True
False

💡 Hint: Think about how viscosity relates to flow rate.

1 more question available

Challenge Problems

Push your limits with advanced challenges

Challenge 1 Hard

Calculate the impact of adjusting the water-to-powder ratio on l T500 time if the initial reading is high. What materials would you change?

💡 Hint: Consider how water affects fluidity.

Challenge 2 Hard

Design a flow test procedure for a new SCC mix aiming for a T500 of 3 seconds and outline key parameters to monitor.

💡 Hint: Think of standard testing protocols we discussed.

Get performance evaluation

Reference links

Supplementary resources to enhance your learning experience.