Replacement Decision

4.2 - Replacement Decision

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions

Question 1 Easy

What is the first phase in the equipment life cycle?

💡 Hint: Think about the starting point of using any equipment.

Question 2 Easy

Define downtime in relation to equipment.

💡 Hint: Consider the time not spent working effectively.

4 more questions available

Interactive Quizzes

Quick quizzes to reinforce your learning

Question 1

What is the economic useful life of equipment?

The entire life of the equipment
The time when it costs most
The time with minimized costs and maximized profits

💡 Hint: Focus on when costs versus profits are optimized.

Question 2

True or False: Downtime is a critical factor that does not affect equipment costs.

True
False

💡 Hint: Think about what happens in projects when equipment isn't working.

1 more question available

Challenge Problems

Push your limits with advanced challenges

Challenge 1 Hard

A construction company has a bulldozer that's 10 years old. It's in a market where bulldozers are often upgraded every 5 years. If the repair costs each year are escalating and last year reached 40% of its original purchase price, analyze the decision to keep vs. replace.

💡 Hint: Evaluate repair costs versus productivity levels.

Challenge 2 Hard

A firm is using an old crane that frequently delays projects because of downtime. Calculate the total cost of downtime over six months if every month it leads to a production delay that costs the firm $2000.

💡 Hint: Consider how much new equipment could save in project delivery times.

Get performance evaluation