Practice Replacement Decision - 4.2 | 15. Equipment Life and Replacement Analysis (Part-1) | Construction Engineering & Management - Vol 1
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is the first phase in the equipment life cycle?

💡 Hint: Think about the starting point of using any equipment.

Question 2

Easy

Define downtime in relation to equipment.

💡 Hint: Consider the time not spent working effectively.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the economic useful life of equipment?

  • The entire life of the equipment
  • The time when it costs most
  • The time with minimized costs and maximized profits

💡 Hint: Focus on when costs versus profits are optimized.

Question 2

True or False: Downtime is a critical factor that does not affect equipment costs.

  • True
  • False

💡 Hint: Think about what happens in projects when equipment isn't working.

Solve 1 more question and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

A construction company has a bulldozer that's 10 years old. It's in a market where bulldozers are often upgraded every 5 years. If the repair costs each year are escalating and last year reached 40% of its original purchase price, analyze the decision to keep vs. replace.

💡 Hint: Evaluate repair costs versus productivity levels.

Question 2

A firm is using an old crane that frequently delays projects because of downtime. Calculate the total cost of downtime over six months if every month it leads to a production delay that costs the firm $2000.

💡 Hint: Consider how much new equipment could save in project delivery times.