2.2 - Utilization Charts and Resource Scheduling
Enroll to start learning
You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.
Practice Questions
Test your understanding with targeted questions
What is the impact of high wind velocity on crane operations?
💡 Hint: Think about the safety measures involved.
Define rolling resistance.
💡 Hint: Consider the terrain’s influence on movement.
4 more questions available
Interactive Quizzes
Quick quizzes to reinforce your learning
What is the maximum wind speed for safe crane operations?
💡 Hint: Recall the guidelines discussed.
True or False: Crawler-mounted machines are less effective in muddy conditions compared to wheeled ones.
💡 Hint: Think about the traction capabilities of different machines.
2 more questions available
Challenge Problems
Push your limits with advanced challenges
Analyze a scenario where heavy rainfall leads to muddy conditions. Recommend machinery choices and justify your selections.
💡 Hint: Think about traction and terrain performance.
Design a detailed utilization chart for XXX construction project that requires cranes and dump trucks. Explain your approach.
💡 Hint: Consider overlap and busy schedules when planning.
Get performance evaluation
Reference links
Supplementary resources to enhance your learning experience.