Practice Utilization Charts and Resource Scheduling - 2.2 | 3. Selection of Crane Based on Conditions | Construction Engineering & Management - Vol 1
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is the impact of high wind velocity on crane operations?

💡 Hint: Think about the safety measures involved.

Question 2

Easy

Define rolling resistance.

💡 Hint: Consider the terrain’s influence on movement.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the maximum wind speed for safe crane operations?

  • 30 km/h
  • 50 km/h
  • 100 km/h

💡 Hint: Recall the guidelines discussed.

Question 2

True or False: Crawler-mounted machines are less effective in muddy conditions compared to wheeled ones.

  • True
  • False

💡 Hint: Think about the traction capabilities of different machines.

Solve 2 more questions and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

Analyze a scenario where heavy rainfall leads to muddy conditions. Recommend machinery choices and justify your selections.

💡 Hint: Think about traction and terrain performance.

Question 2

Design a detailed utilization chart for XXX construction project that requires cranes and dump trucks. Explain your approach.

💡 Hint: Consider overlap and busy schedules when planning.

Challenge and get performance evaluation