Enrol to start learning
Reading is open to everyone. Enrolling is free, and it is what unlocks the audio lessons, practice tests and progress tracking.
3. Dozing Methods
This section
Practice test
10 questions on this section. Wrong answers show you what to read again.
Sign up to take itWhole chapter
Revision test
Mixed questions from across the chapter. Your answers get marked.
Sign up to take itQuick
Flashcard drill
2 cards from this lesson. Good the night before a test.
Try these first
- 1.
What is end spillage?
Hint
Think about the material movement when using a bulldozer.
- 2.
Why is slot dozing effective?
Hint
Consider how cuts are arranged during the process.
- 3.
What is the purpose of slot dozing?
- To increase speed
- To reduce end spillage
- To change blade type
Hint
Focus on how material is managed during dozing.
- 4.
True or False: Blade-to-blade dozing can reduce spillage by up to 50%.
- True
- False
Hint
Consider the interaction between the two machines.
- 5.
Design a dozing plan for a hilly terrain using the blade-to-blade method. Detail the challenges and solutions.
Hint
Consider the physical properties of the land and the skills required.
- 6.
Assess the environmental impact of increased dozer productivity. Propose methods to mitigate negative effects.
Hint
Think broadly about ecology as well while considering productivity.
Exercises
Total Questions
2
Estimated Time
4 min
Passing Score
70%
Instructions
- Read each question carefully
- You can use hints if you need help
- Complete all questions before submitting
4 more questions available
Enrol freeQuiz
Total Questions
2
Estimated Time
4 min
Passing Score
70%
Instructions
- Read each question carefully
- You can use hints if you need help
- Complete all questions before submitting
Get your answers marked and your progress tracked
Enrol freeChallenge Problems
Total Questions
2
Estimated Time
4 min
Passing Score
70%
Instructions
- Read each question carefully
- You can use hints if you need help
- Complete all questions before submitting