Practice Production Cycle of a Scraper - 1.6 | 6. Earth Moving Equipment-Scrapers (Part-1) | Construction Engineering & Management - Vol 2
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is the primary function of a scraper?

💡 Hint: Think about the basic roles of equipment in construction.

Question 2

Easy

What is a pusher-loaded scraper?

💡 Hint: Remember how pusher-loaders operate with bulldozers.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is a scraper primarily used for?

  • Excavating
  • Hauling
  • Loading and Dumping

💡 Hint: Think about the functions that scrapers perform.

Question 2

True or False: A pusher-loaded scraper requires assistance during its loading operation.

  • True
  • False

💡 Hint: Recall the characteristics of pusher loaders.

Solve 1 more question and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

A construction site requires moving 500 cubic meters of soil from one location to another 1000 meters away. Would a scraper be a suitable choice? Explain your reasoning.

💡 Hint: Consider the volume and distance relative to scraper specifications.

Question 2

Design a basic operation plan using a pusher-loaded scraper and a bulldozer for a road project. Identify steps and expected productivity.

💡 Hint: Map out the roles of machinery in your construction plan.

Challenge and get performance evaluation