7.5 - Post-Construction Evaluation
Enroll to start learning
You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.
Practice Questions
Test your understanding with targeted questions
What is the purpose of post-construction evaluation?
💡 Hint: Think about what happens after a building is built.
Name one method for assessing accessibility.
💡 Hint: Consider who gets to use the building.
4 more questions available
Interactive Quizzes
Quick quizzes to reinforce your learning
What is the main goal of post-construction evaluation?
💡 Hint: Focus on what happens to ensure everyone can use the space.
True or false: User feedback is optional in accessibility evaluations.
💡 Hint: Think about who actually uses the space.
Get performance evaluation
Challenge Problems
Push your limits with advanced challenges
Consider a newly constructed library with reported usability issues by visually impaired users. Develop a strategy for conducting a post-construction evaluation.
💡 Hint: Consider who should participate in the evaluation.
Analyze the impact of not incorporating user feedback post-construction on future projects.
💡 Hint: Think about how integrating user experiences can improve future building designs.
Get performance evaluation
Reference links
Supplementary resources to enhance your learning experience.