4 - Criterion C: Creating the Solution
Enroll to start learning
You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.
Practice Questions
Test your understanding with targeted questions
What is a production plan in the context of prototype development?
💡 Hint: Think about why we need a plan before starting.
Name one aspect of quality control in prototype construction.
💡 Hint: How do we ensure our prototype works well?
4 more questions available
Interactive Quizzes
Quick quizzes to reinforce your learning
What does a production plan consist of?
💡 Hint: Consider what you need before starting a project.
True or False: Quality control is only necessary at the end of the prototype development.
💡 Hint: Think about when you would check for issues.
1 more question available
Challenge Problems
Push your limits with advanced challenges
Given a prototype that fails at a drop test, describe a systematic approach to identify and rectify the issue based on your production plan.
💡 Hint: What would you check about the materials and construction methods used?
How would you redesign a production plan if you learned that your initial materials are not locally available?
💡 Hint: Consider what aspects need to be adapted to maintain sustainability.
Get performance evaluation
Reference links
Supplementary resources to enhance your learning experience.