3.3.7.12 - Missing Line Measurement (MLM)
Enroll to start learning
You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.
Practice Questions
Test your understanding with targeted questions
What does MLM stand for in the context of surveying?
💡 Hint: Think about the terminology used in surveying.
Name one instrument used in MLM.
💡 Hint: Consider the tools we use in precise measurements.
4 more questions available
Interactive Quizzes
Quick quizzes to reinforce your learning
What is MLM?
💡 Hint: Think about the context of measurements in surveying.
True or False: Total Stations cannot be used for MLM.
💡 Hint: Consider the tools used in surveying.
1 more question available
Challenge Problems
Push your limits with advanced challenges
A surveyor finds themselves in a situation where they need to measure a plot of land obstructed by a large building. Describe a step-by-step approach using MLM to achieve this.
💡 Hint: Think logically about the necessary steps in surveying around obstacles.
In a construction zone, due to unexpected obstacles, some measurements obtained through MLM were inaccurate. List and explain potential repercussions if this matter isn't addressed.
💡 Hint: Consider the long-term effects of incorrect measurements.
Get performance evaluation
Reference links
Supplementary resources to enhance your learning experience.