Practice Experiment 4: Impact Of Transistor Sizing (w/l) On Delay (4.4) - CMOS Inverter Switching Characteristics & Delay Analysis
Students

Academic Programs

AI-powered learning for grades 8-12, aligned with major curricula

Professional

Professional Courses

Industry-relevant training in Business, Technology, and Design

Games

Interactive Games

Fun games to boost memory, math, typing, and English skills

Experiment 4: Impact of Transistor Sizing (W/L) on Delay

Practice - Experiment 4: Impact of Transistor Sizing (W/L) on Delay

Learning

Practice Questions

Test your understanding with targeted questions

Question 1 Easy

What is the primary effect of increasing the NMOS width in a CMOS inverter?

💡 Hint: Think about current flow and switching times.

Question 2 Easy

What does W/L ratio represent in a transistor?

💡 Hint: Consider its role in performance characteristics.

4 more questions available

Interactive Quizzes

Quick quizzes to reinforce your learning

Question 1

What happens to propagation delay when NMOS width is increased?

Increases
Decreases
Stays the Same

💡 Hint: Recall the relationship between width and current flow.

Question 2

True or False: A balanced inverter has tpHL equal to tpLH.

True
False

💡 Hint: Think about the implications on overall inverter performance.

1 more question available

Challenge Problems

Push your limits with advanced challenges

Challenge 1 Hard

Given a CMOS inverter with NMOS dimensions of 0.5μm and PMOS of 1.0μm, what would be the expected delay behavior if the NMOS width is doubled while keeping the PMOS constant?

💡 Hint: Think about how increasing width affects current flow.

Challenge 2 Hard

If a design requires balancing tpHL and tpLH, what iterative adjustments might one make if the NMOS width was initially set too low?

💡 Hint: Reflect on the relationship between delays and transistor dimensions.

Get performance evaluation

Reference links

Supplementary resources to enhance your learning experience.