Practice - Lab Procedures & Experiments
Practice Questions
Test your understanding with targeted questions
What is the purpose of transient simulations?
💡 Hint: Think about how the inverter responds over time.
Define load capacitance in the context of a CMOS inverter.
💡 Hint: Consider what happens when you add more load.
4 more questions available
Interactive Quizzes
Quick quizzes to reinforce your learning
What is the typical relationship between load capacitance and propagation delay?
💡 Hint: Consider how load affects current flow.
True or False: Static power is primary in CMOS inverters during switching.
💡 Hint: When does the inverter consume power when it’s not switching?
1 more question available
Challenge Problems
Push your limits with advanced challenges
Design and simulate a CMOS inverter for a delay less than 10ps while managing a load of 50fF. Provide a step-by-step approach to reach this design.
💡 Hint: How does altering widths affect current capability?
Evaluate the trade-offs between static and dynamic power in CMOS design. Discuss implications for battery-powered applications.
💡 Hint: When does the circuit stay off but still consume power?
Get performance evaluation
Reference links
Supplementary resources to enhance your learning experience.