Practice - Objective - 4.4.1
Practice Questions
Test your understanding with targeted questions
Define transient simulation in the context of CMOS inverters.
💡 Hint: Think about how we observe changes when signals are applied.
What does increased load capacitance do to propagation delay?
💡 Hint: Consider how capacitance influences charge times.
4 more questions available
Interactive Quizzes
Quick quizzes to reinforce your learning
What is the primary purpose of transient simulations?
💡 Hint: Think about what happens when input signals change.
True or False: Load capacitance decreases the propagation delay in a CMOS inverter.
💡 Hint: Consider the effect of capacitance on charging times.
1 more question available
Challenge Problems
Push your limits with advanced challenges
Design a CMOS inverter with a target propagation delay of 20 ps given a load capacitance of 50 fF. Iterate on W/L ratios to achieve the desired performance.
💡 Hint: What adjustments would help achieve the desired speed?
Calculate the total dynamic power dissipation for a CMOS inverter switching at frequencies ranging from 1 MHz to 10 MHz.
💡 Hint: How would fast switching affect power consumption?
Get performance evaluation
Reference links
Supplementary resources to enhance your learning experience.