Practice Find Potential Slowest Paths (4.3.1) - Final Project / Open-Ended Design Challenge
Students

Academic Programs

AI-powered learning for grades 8-12, aligned with major curricula

Professional

Professional Courses

Industry-relevant training in Business, Technology, and Design

Games

Interactive Games

Fun games to boost memory, math, typing, and English skills

Find Potential Slowest Paths

Practice - Find Potential Slowest Paths

Learning

Practice Questions

Test your understanding with targeted questions

Question 1 Easy

What is a critical path?

💡 Hint: Think about how slow components affect the overall speed.

Question 2 Easy

What do you measure along a suspected critical path?

💡 Hint: Look for the time taken for inputs to affect outputs.

4 more questions available

Interactive Quizzes

Quick quizzes to reinforce your learning

Question 1

What defines the critical path in a circuit?

The shortest route
The route with the least gates
The longest delay

💡 Hint: Remember what happens if signals take too long to propagate.

Question 2

True or False: Optimizing the critical path can increase the maximum operating speed of the circuit.

True
False

💡 Hint: Think about circuit performance and speed.

2 more questions available

Challenge Problems

Push your limits with advanced challenges

Challenge 1 Hard

Your circuit design has a critical path with several gates causing delays. Propose three specific strategies you might use to optimize the speed of this path.

💡 Hint: Think about what factors contribute most to the slowdown.

Challenge 2 Hard

A signal travels through a series of gates, with delays measured at 2ns, 3ns, and 5ns. Identify the critical path and explain why it's critical.

💡 Hint: What happens to the circuit speed if one path is delayed?

Get performance evaluation

Reference links

Supplementary resources to enhance your learning experience.