Practice Phase 3: Critical Path Analysis (4.3) - Final Project / Open-Ended Design Challenge
Students

Academic Programs

AI-powered learning for grades 8-12, aligned with major curricula

Professional

Professional Courses

Industry-relevant training in Business, Technology, and Design

Games

Interactive Games

Fun games to boost memory, math, typing, and English skills

Phase 3: Critical Path Analysis

Practice - Phase 3: Critical Path Analysis

Learning

Practice Questions

Test your understanding with targeted questions

Question 1 Easy

What is the critical path in a digital circuit?

💡 Hint: Think about the delays in the paths of a circuit.

Question 2 Easy

Define propagation delay.

💡 Hint: Think about the impact of an input change on an output.

4 more questions available

Interactive Quizzes

Quick quizzes to reinforce your learning

Question 1

What is the critical path in a digital circuit?

The shortest path
The longest delay path
Any path

💡 Hint: Think about which path length determines maximum speed.

Question 2

True or False: The setup time is the time after the clock edge that an input must be stable.

True
False

💡 Hint: Remember the timing when signals must be stable.

1 more question available

Challenge Problems

Push your limits with advanced challenges

Challenge 1 Hard

Your circuit contains a critical path with a delay of 40 ns and a setup time of 8 ns. What is the maximum frequency of your clock signal?

💡 Hint: Make sure to add the critical path delay and setup time together before computing frequency.

Challenge 2 Hard

If the critical path can be optimized to reduce its delay to 30 ns, what is the new maximum operating frequency?

💡 Hint: Reduced delay leads to increased frequency—calculate accordingly.

Get performance evaluation

Reference links

Supplementary resources to enhance your learning experience.