Practice Post-Lab Questions and Analysis - 5 | Lab Module 10: ASIC Design Flow - Floorplanning, Placement, and Routing (Conceptual/Tool Demonstration) | VLSI Design Lab
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

5 - Post-Lab Questions and Analysis

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is the purpose of floorplanning in ASIC design?

💡 Hint: Think about the blueprint analogy.

Question 2

Easy

What does post-layout extraction analyze?

💡 Hint: Consider what happens after the routing is done.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What phase comes after the logical design in ASIC?

  • Synthesis
  • Physical Implementation
  • Verification

💡 Hint: Think about the sequence of design processes.

Question 2

True or False: Power delivery networks only need to be planned after routing.

  • True
  • False

💡 Hint: Consider when power distribution is designed.

Solve 2 more questions and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

Given a scenario where the floorplan is poorly designed, elaborate on how various aspects of placement and routing might be impacted.

💡 Hint: Consider the domino effect of each design stage's failures.

Question 2

Design a hypothetical ASIC layout addressing the trade-offs between power delivery and performance constraints. Explain your design decisions.

💡 Hint: Reflect on how layout decisions influence overall performance.

Challenge and get performance evaluation