Practice Understanding the 'Critical Path': The Speed Bottleneck - 2.2 | Lab Module 11: Final Project / Open-Ended Design Challenge | VLSI Design Lab
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

2.2 - Understanding the 'Critical Path': The Speed Bottleneck

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is the critical path in a digital circuit?

💡 Hint: Think about what limits the speed in a circuit design.

Question 2

Easy

Name one reason why documentation is important in circuit design.

💡 Hint: Consider teamwork and continuity.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What determines the maximum speed of a circuit?

  • The critical path
  • The shortest path
  • Random gates

💡 Hint: Remember what holds back the speed.

Question 2

True or False: A circuit can function without analyzing the critical path.

  • True
  • False

💡 Hint: Think about the importance of knowing the slowest path.

Solve and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

Propose a redesign for a digital circuit where the critical path limits performance. Suggest at least three changes that could improve speed.

💡 Hint: Think about where delays are occurring.

Question 2

Provide an example of how layout design can specifically impact the propagation delay of a critical path in a complex circuit.

💡 Hint: Consider parasitic effects in your explanation.

Challenge and get performance evaluation