Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.
Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.
Test your understanding with targeted questions related to the topic.
Question 1
Easy
What are the two types of transistors used in a CMOS inverter?
💡 Hint: Think about their complementary functionality.
Question 2
Easy
What does the propagation delay measure in an inverter?
💡 Hint: It relates to switching events.
Practice 4 more questions and get performance evaluation
Engage in quick quizzes to reinforce what you've learned and check your comprehension.
Question 1
What type of power is consumed during switching actions?
💡 Hint: This power is not present when the inverter is inactive.
Question 2
True or False: The larger the load capacitance, the faster the inverter switches.
💡 Hint: Think about the relationship between capacitance and speed.
Solve and get performance evaluation
Push your limits with challenges.
Question 1
Design a CMOS inverter to achieve a specified propagation delay of 10 ns while maintaining balanced rise and fall times. What considerations must you account for?
💡 Hint: Think about how to use iterative design to meet the requirements.
Question 2
Calculate the dynamic power consumption of a CMOS inverter with a load of 100 fF operating at 3.3V and switching at a frequency of 1 MHz. What are your results?
💡 Hint: Remember, f is frequency and adjust your unit conversions accordingly.
Challenge and get performance evaluation