Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.
Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.
Test your understanding with targeted questions related to the topic.
Question 1
Easy
What does a transient simulation observe?
💡 Hint: Think about what kind of signals we see over time.
Question 2
Easy
What is the significance of measuring propagation delay?
💡 Hint: Why is speed important in circuits?
Practice 4 more questions and get performance evaluation
Engage in quick quizzes to reinforce what you've learned and check your comprehension.
Question 1
What is the primary purpose of performing transient simulations on a CMOS inverter?
💡 Hint: Think about what you can learn from observing input vs. output over time.
Question 2
True or False: Load capacitance always decreases the speed of a CMOS inverter.
💡 Hint: Consider how load affects switching speed.
Solve 1 more question and get performance evaluation
Push your limits with challenges.
Question 1
Design a CMOS inverter with a specific propagation delay target of 30 ps while considering varying load capacitance and transistor sizing.
💡 Hint: Use iterative design methods; adjust widths while recording delays.
Question 2
Analyze and compare the static and dynamic power consumption of an inverter under different load configurations using values obtained from your laboratory experiments.
💡 Hint: Consider using the average power formulas and measure after several cycles.
Challenge and get performance evaluation