Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.
Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.
Test your understanding with targeted questions related to the topic.
Question 1
Easy
What is parasitic extraction?
💡 Hint: Think about what arises from the geometry of the layout.
Question 2
Easy
Why is LVS verification critical?
💡 Hint: Consider what errors might arise during fabrication.
Practice 4 more questions and get performance evaluation
Engage in quick quizzes to reinforce what you've learned and check your comprehension.
Question 1
What is the purpose of parasitic extraction?
💡 Hint: Think about what aspects of a layout are not ideal.
Question 2
True or false: LVS verification ensures that the schematic and layout are identical.
💡 Hint: Focus on the verification purpose.
Solve 1 more question and get performance evaluation
Push your limits with challenges.
Question 1
A post-layout simulation shows a significant increase in propagation delay compared to pre-layout. What might be the contributing factors, and how would you address them?
💡 Hint: Think about how interconnect geometry affects performance.
Question 2
Explain the significance of dynamic power dissipation in post-layout analysis. How does it relate to the design of power delivery networks?
💡 Hint: Think about how capacitive loads can lead to power considerations.
Challenge and get performance evaluation