Practice Run Extraction - 4.2.4 | Lab Module 5: Layout Versus Schematic (LVS) Verification and Post-Layout Simulation | VLSI Design Lab
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

4.2.4 - Run Extraction

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What does parasitic extraction help quantify?

💡 Hint: Think about the physical elements you wish to measure in the circuit.

Question 2

Easy

Why is LVS important before tape-out?

💡 Hint: Consider the consequences of mismatches in the fabrication process.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the primary purpose of parasitic extraction?

  • To create a layout
  • To quantify parasitics
  • To validate the design

💡 Hint: Think about what extraction is primarily measuring.

Question 2

True or False: LVS verification confirms the functional behavior of a circuit.

  • True
  • False

💡 Hint: Consider what LVS checks specifically.

Solve and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

Given a specific layout, explain the process of extracting parasitics and the potential challenges during extraction.

💡 Hint: Think about the steps involved and potential pitfalls.

Question 2

Discuss how one would analyze post-layout simulation results to determine the need for further optimizations.

💡 Hint: Reflect on metrics you would focus on and optimization strategies.

Challenge and get performance evaluation