Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.
Fun, engaging games to boost memory, math fluency, typing speed, and English skillsβperfect for learners of all ages.
Enroll to start learning
Youβve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take mock test.
Listen to a student-teacher conversation explaining the topic in a relatable way.
Signup and Enroll to the course for listening the Audio Lesson
Today, we are going to discuss how much time you should allocate for our project on the 2BHK residential floor plan. Can anyone guess how long we should spend on this?
Is it going to take a whole week?
Good question! The estimated time is actually between 6 to 8 hours, but it can be stretched over 2 to 3 days. This way, you can grasp every concept better.
Why is it split into days instead of doing everything in one go?
Splitting the project helps avoid burnout. You have time to reflect on each step and practice the tools learned. What tools do we plan to use in this project?
We will use drawing tools like Line and Rectangle!
Exactly! And with each session, remember to manage your time wisely. Time management is key for successful project completion.
So, taking breaks is important, right?
Yes! Regular breaks can enhance focus and creativity during your work. Let's move on and create a timeline for our project!
Signup and Enroll to the course for listening the Audio Lesson
Now that we know the project will take around 6 to 8 hours, how should we allocate this time effectively?
Can we break it down into specific sections?
That's a fantastic approach! For instance, setting aside 1 hour for setting up your drawing is a great start. How about the wall creation?
Maybe another hour to draw the walls?
Perfect! Next, we can add doors and windows, which might take approximately 1.5 hours. Always remember to maintain realistic proportions.
And then we need time for furniture placement and annotations?
Absolutely! Each element contributes to the overall layout, so giving them appropriate time ensures clarity and completeness. Now, who can summarize this management plan?
Read a summary of the section's main ideas. Choose from Basic, Medium, or Detailed.
The section provides a detailed estimation of the time required for creating a 2BHK residential floor plan using AutoCAD. It suggests that this project can be effectively split across 2 to 3 days, allowing for a comprehensive learning experience while applying various AutoCAD tools and commands.
The estimated time needed to complete the 2BHK residential floor plan project in AutoCAD is approximately 6-8 hours. This duration is advised to be divided across 2 to 3 days. Dividing the tasks helps learners to effectively manage their time and allows for deeper engagement with the core concepts of AutoCAD. During this time, students will gain hands-on experience with fundamental elements such as drawing tools, layers, annotation, dimensioning, hatching, and plotting, culminating in a complete and polished project suitable for presentation or inclusion in a design portfolio.
Dive deep into the subject with an immersive audiobook experience.
Signup and Enroll to the course for listening the Audio Book
6-8 hours (can be split across 2β3 days)
The total time required to complete this project is estimated to be between 6 to 8 hours. This time can be divided into smaller work sessions spread out over 2 to 3 days. For instance, if you choose to work for 2 hours each day, you could accomplish the project in 3 days, or by working longer hours, you could finish in just 2 days.
Think of this time allocation like planning a road trip. If your destination is 600 miles away, you could drive for 8 hours straight one day or spread the trip over 3 days, taking breaks and enjoying different sights along the way. This approach helps ensure you're not rushed and can fully engage with each step of your project.
Learn essential terms and foundational ideas that form the basis of the topic.
Key Concepts
Time Management: Allocating time effectively to complete projects.
Project Breakdown: Segmenting tasks to manage time efficiently.
Learning Retention: Gaining better understanding through spaced practice.
See how the concepts apply in real-world scenarios to understand their practical implications.
Completing the wall layout in one hour before moving on to door placements.
Using time slots of 30 minutes each for furniture placement to enhance focus.
Use mnemonics, acronyms, or visual cues to help remember key information more easily.
In two to three days, donβt delay, 6 to 8 hours, thatβs the way!
Imagine a builder who divides his work into days. He starts with the framework on day one, lays walls on day two, and finishes with furniture on day three.
DODD: Divide time, Organize tasks, Daily goals, Don't rush.
Review key concepts with flashcards.
Review the Definitions for terms.
Term: 2BHK
Definition:
A residential floor plan design consisting of 2 bedrooms, 1 hall and 1 kitchen.
Term: AutoCAD
Definition:
A software application for 2D and 3D CAD design and drafting.
Term: Layer
Definition:
Layers are used in CAD to organize different elements of the drawing.
Term: Annotation
Definition:
Textual information added to drawings to provide additional context or data.
Term: Dimensioning
Definition:
The process of adding measurements to a drawing to denote sizes and distances.
Term: Hatching
Definition:
A technique used to create patterns or textures within a drawing.
Term: Plotting
Definition:
The process of creating a printed version of the drawing, often to PDF.