Practice Duration of Curing - 10.4 | 10. Fresh Concrete – Curing Methods | Civil Engineering Materials, Testing & Evaluation - Vol 1
Students

Academic Programs

AI-powered learning for grades 8-12, aligned with major curricula

Professional

Professional Courses

Industry-relevant training in Business, Technology, and Design

Games

Interactive Games

Fun games to boost memory, math, typing, and English skills

Duration of Curing

10.4 - Duration of Curing

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions

Question 1 Easy

What is the minimum curing time for ordinary Portland cement?

💡 Hint: Look for the basic requirement of curing for this cement type.

Question 2 Easy

Why is curing necessary?

💡 Hint: Think about the consequences of not curing concrete.

4 more questions available

Interactive Quizzes

Quick quizzes to reinforce your learning

Question 1

What is the minimum curing period for blended cement?

7 days
10 days
14 days

💡 Hint: Refer to the curing standards for different cement types.

Question 2

True or False: In hot climates, curing can be shortened to 5 days.

True
False

💡 Hint: Think about how environmental factors influence curing times.

1 more question available

Challenge Problems

Push your limits with advanced challenges

Challenge 1 Hard

A bridge contractor decides to cure a mix of ordinary Portland cement for only 5 days in hot weather. Identify potential issues this could cause.

💡 Hint: Think about how insufficient moisture retention affects concrete.

Challenge 2 Hard

In a hot climate, decide how you would set up a curing plan for a large slab using blended cement. Consider all factors.

💡 Hint: Consider both water access and weather predictions when planning.

Get performance evaluation

Reference links

Supplementary resources to enhance your learning experience.