10.7 - IS Code Provisions for Curing
Enroll to start learning
You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.
Practice Questions
Test your understanding with targeted questions
What is the minimum curing period for concrete under normal conditions?
💡 Hint: Refer to the curing requirements discussed in IS 456:2000.
What is blended cement?
💡 Hint: Think about cement types and their mixtures.
4 more questions available
Interactive Quizzes
Quick quizzes to reinforce your learning
What is the minimum curing period for ordinary Portland cement?
💡 Hint: Remember standard curing practices.
Curing is not necessary for concrete to harden. True or False?
💡 Hint: Think about the hydration process in concrete.
1 more question available
Challenge Problems
Push your limits with advanced challenges
Design a curing plan for a large concrete slab to be poured in hot weather. Outline which methods you will apply and the durations you will ensure for different cement types.
💡 Hint: Consider hydration needs and environmental controls.
Calculate the impact of not curing concrete adequately. If a structure is only cured for 3 days rather than the required 7, what potential issues could arise?
💡 Hint: Reflect on the requirements outlined in IS 456 and hydration importance.
Get performance evaluation
Reference links
Supplementary resources to enhance your learning experience.