Practice Flow Table Test - 7.2.3 | 7. Fresh Concrete – Properties and Workability Tests (IS Standards) | Civil Engineering Materials, Testing & Evaluation - Vol 1
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

7.2.3 - Flow Table Test

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is the primary purpose of the Flow Table Test?

💡 Hint: Think about why concrete flow is important.

Question 2

Easy

What apparatus is used in the Flow Table Test?

💡 Hint: Remember, it involves a special table and mold.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the significance of the Flow Table Test in concrete workability?

  • It measures strength
  • It determines flowability
  • It tests for segregation

💡 Hint: Think about what aspect of fresh concrete it assesses.

Question 2

True or False: The Flow Table Test is suitable for testing very low workability concrete.

  • True
  • False

💡 Hint: Consider the type of concrete being assessed.

Solve 1 more question and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

A concrete mix is tested, and it spreads to 600 mm in both directions after the Flow Table Test. If the original diameter was 400 mm, calculate the flow percentage.

💡 Hint: Use the provided formula carefully.

Question 2

How would you modify the concrete mix if the Flow Table Test indicated poor flowability, say only 350% spread for a self-compacting mix?

💡 Hint: Think about what factors affect flowability.

Challenge and get performance evaluation