Enrol to start learning
Reading is open to everyone. Enrolling is free, and it is what unlocks the audio lessons, practice tests and progress tracking.
3. Placing of Concrete
This section
Practice test
10 questions on this section. Wrong answers show you what to read again.
Sign up to take itWhole chapter
Revision test
Mixed questions from across the chapter. Your answers get marked.
Sign up to take itQuick
Flashcard drill
2 cards from this lesson. Good the night before a test.
Try these first
- 1.
Why should concrete be placed close to its final position?
Hint
Think about how handling affects the mixture.
- 2.
What is segregation in concrete?
Hint
Consider what might happen if materials are not mixed well.
- 3.
What is the maximum height from which concrete can be dropped?
- 1.0 meters
- 1.5 meters
- 2.0 meters
Hint
Consider the guidelines mentioned.
- 4.
True or False: Segregation can improve concrete strength.
- True
- False
Hint
Think about how the mixing affects strength.
- 5.
Design a small-scale concrete pouring operation for a garden slab. What methods would you choose and why?
Hint
Consider the size of tools and ease of movement.
- 6.
Analyze the implications of placing concrete without following the specified 30-minute rule.
Hint
Think about what happens to a mixture that's left sitting.
Exercises
Total Questions
2
Estimated Time
4 min
Passing Score
70%
Instructions
- Read each question carefully
- You can use hints if you need help
- Complete all questions before submitting
4 more questions available
Enrol freeQuiz
Total Questions
2
Estimated Time
4 min
Passing Score
70%
Instructions
- Read each question carefully
- You can use hints if you need help
- Complete all questions before submitting
Get your answers marked and your progress tracked
Enrol freeChallenge Problems
Total Questions
2
Estimated Time
4 min
Passing Score
70%
Instructions
- Read each question carefully
- You can use hints if you need help
- Complete all questions before submitting