Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.
Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.
Enroll to start learning
You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.
Test your understanding with targeted questions related to the topic.
Question 1
Easy
What was the main issue in the RCC building case?
💡 Hint: Think about the types of water used in construction.
Question 2
Easy
What is a key factor for proper concrete setting?
💡 Hint: Consider the role of different types of water.
Practice 4 more questions and get performance evaluation
Engage in quick quizzes to reinforce what you've learned and check your comprehension.
Question 1
What caused the corrosion in the RCC building case?
💡 Hint: Think about the nature of the water used.
Question 2
True or False: Organic contamination can lead to delayed setting times.
💡 Hint: Consider the types of materials that affect hydration.
Solve and get performance evaluation
Push your limits with challenges.
Question 1
Analyze a scenario where construction is performed near a river. Outline a testing protocol for the water used from this river to ensure its quality meets construction standards, considering potential contaminants.
💡 Hint: Think about the impurities we discussed in class.
Question 2
Suppose a construction project reports delayed setting times. Develop a plan for investigating the cause including tests to run.
💡 Hint: Consider both internal and external factors affecting performance.
Challenge and get performance evaluation