Practice Acceptance Criteria of RMC - 10.3 | 20. Acceptability Criteria in Concrete Mix Design | Civil Engineering Materials, Testing & Evaluation - Vol 2
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

10.3 - Acceptance Criteria of RMC

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is the purpose of acceptance criteria for RMC?

💡 Hint: Think about the quality assurance in construction.

Question 2

Easy

What two key tests are performed to check RMC strength?

💡 Hint: These are related to time intervals post-mixing.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the maximum allowable slump decrease for RMC with superplasticizers?

  • 5%
  • 10%
  • 15%

💡 Hint: Consider industry standards for concrete placement.

Question 2

True or False: Only the 28-day cube test results are essential for RMC acceptance.

  • True
  • False

💡 Hint: Reflect on the testing intervals discussed.

Solve and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

A batch of RMC has a 28-day compressive strength of 22 MPa. The design specification was for 25 MPa. Discuss the actions that should be taken next.

💡 Hint: Consider retesting the materials and reviewing admixtures used.

Question 2

If a contractor discovers that the slump of delivered RMC is too low upon arrival on site, what immediate steps should they take to assess and rectify the situation?

💡 Hint: Think about how to balance immediate and long-term quality control.

Challenge and get performance evaluation