Practice Acceptance of Ready-Mix Concrete (RMC) - 10 | 20. Acceptability Criteria in Concrete Mix Design | Civil Engineering Materials, Testing & Evaluation - Vol 2
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

10 - Acceptance of Ready-Mix Concrete (RMC)

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What does RMC stand for?

💡 Hint: Think about what 'ready-mix' refers to.

Question 2

Easy

Name one parameter checked during delivery acceptance.

💡 Hint: What needs to be verified before using concrete on-site?

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What does RMC stand for?

  • Ready-Mixed Cement
  • Ready-Mix Concrete
  • Ready-Cured Concrete

💡 Hint: Focus on the readiness and mixing aspect.

Question 2

True or False: The maximum transit time for RMC delivery is 120 minutes.

  • True
  • False

💡 Hint: Remember the time constraints to maintain quality.

Solve 2 more questions and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

Consider a scenario where RMC arrives at the site after 100 minutes. Discuss the steps an engineer would take to determine whether to accept or reject this batch.

💡 Hint: How do time and temperature affect the properties of the concrete?

Question 2

Imagine you are managing a large project that relies on timely deliveries of RMC. What strategies could you implement to ensure the materials always meet the acceptance criteria upon arrival?

💡 Hint: Think of ways to mitigate delays and ensure quality control.

Challenge and get performance evaluation