Practice Long-Term Measures - 6.2 | 20. Acceptability Criteria in Concrete Mix Design | Civil Engineering Materials, Testing & Evaluation - Vol 2
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

6.2 - Long-Term Measures

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is the first step to take when concrete fails to meet standards?

💡 Hint: Think about what adjustments you would need to make.

Question 2

Easy

Define quality control in concrete production.

💡 Hint: It involves monitoring and assessing mixtures.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the primary objective of reevaluating the mix design?

  • Increase cost
  • Ensure future reliability
  • Avoid responsibility

💡 Hint: Think about what we aim to fix.

Question 2

True or False: Accurate batching systems contribute to reduced human error.

  • True
  • False

💡 Hint: Consider how automation affects accuracy.

Solve and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

A construction project experienced a significant drop in the compressive strength of its concrete over several months. Develop a step-by-step plan to address this issue focusing on long-term measures.

💡 Hint: Consider all aspects from analysis to implementation.

Question 2

How would you assess the success of the new batching system implemented on a construction site?

💡 Hint: Think about specific metrics and feedback mechanisms.

Challenge and get performance evaluation