Practice Cost Estimation of Painting Works - 16 | 36. Introduction to Wall Finishes | Civil Engineering Materials, Testing & Evaluation - Vol 2
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

16 - Cost Estimation of Painting Works

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What does cost estimation in painting works refer to?

💡 Hint: Think about budgeting!

Question 2

Easy

What does TANS stand for?

💡 Hint: It's an acronym we just discussed.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the formula for calculating total cost in painting works?

  • Total Cost = Area × Rate
  • Total Cost = Rate + Area
  • Total Cost = Area – Rate

💡 Hint: Consider how costs are generally calculated!

Question 2

Is it necessary to consider the surface condition before painting?

  • True
  • False

💡 Hint: What happens if you don't prepare the surface properly?

Solve 1 more question and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

You have a room with four walls, each measuring 4m x 3m. If the rate for painting is ₹50/m² and you need two coats, calculate the total estimation including primer.

💡 Hint: Don't forget to calculate the area first!

Question 2

Your school needs to paint a 500 m² area with an initial estimate of ₹40/m², but due to damages, the surface requires extra prep work, adding ₹5/m². How much does the new estimation change?

💡 Hint: Remember to consider the increased rate due to additional work!