Practice Estimation of Water Content - 6 | 19. Objectives of Mix Design | Civil Engineering Materials, Testing & Evaluation - Vol 2
Students

Academic Programs

AI-powered learning for grades 8-12, aligned with major curricula

Professional

Professional Courses

Industry-relevant training in Business, Technology, and Design

Games

Interactive Games

Fun games to boost memory, math, typing, and English skills

Estimation of Water Content

6 - Estimation of Water Content

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions

Question 1 Easy

What is workability in concrete?

💡 Hint: Think about what aspects of concrete placement matter for its usability.

Question 2 Easy

Name two shapes of aggregates and their impact on water content.

💡 Hint: Consider how the shape affects packing and flow of the mix.

4 more questions available

Interactive Quizzes

Quick quizzes to reinforce your learning

Question 1

What is the primary purpose of estimating water content in concrete mix design?

To increase aggregate size
To ensure proper workability
To reduce cement content

💡 Hint: Think about the role of water in the fluidity of concrete.

Question 2

True or False: Angular aggregates require less water than rounded aggregates.

True
False

💡 Hint: Consider how the shape contributes to the need for extra water.

2 more questions available

Challenge Problems

Push your limits with advanced challenges

Challenge 1 Hard

Design a concrete mix for a desired slump of 80 mm using angular aggregates with an existing base water content of 200 kg/m³. Calculate the new water content.

💡 Hint: Break the problem into parts by first calculating the slump changes.

Challenge 2 Hard

You're tasked with mixing concrete that requires superplasticizers. If the original estimated water content was 250 kg, how do you calculate the revised content?

💡 Hint: Focus on the adjustment percentage for superplasticizers and apply it accurately.

Get performance evaluation

Reference links

Supplementary resources to enhance your learning experience.