Practice Estimation of Water Content - 6 | 19. Objectives of Mix Design | Civil Engineering Materials, Testing & Evaluation - Vol 2
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

6 - Estimation of Water Content

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is workability in concrete?

💡 Hint: Think about what aspects of concrete placement matter for its usability.

Question 2

Easy

Name two shapes of aggregates and their impact on water content.

💡 Hint: Consider how the shape affects packing and flow of the mix.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the primary purpose of estimating water content in concrete mix design?

  • To increase aggregate size
  • To ensure proper workability
  • To reduce cement content

💡 Hint: Think about the role of water in the fluidity of concrete.

Question 2

True or False: Angular aggregates require less water than rounded aggregates.

  • True
  • False

💡 Hint: Consider how the shape contributes to the need for extra water.

Solve 2 more questions and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

Design a concrete mix for a desired slump of 80 mm using angular aggregates with an existing base water content of 200 kg/m³. Calculate the new water content.

💡 Hint: Break the problem into parts by first calculating the slump changes.

Question 2

You're tasked with mixing concrete that requires superplasticizers. If the original estimated water content was 250 kg, how do you calculate the revised content?

💡 Hint: Focus on the adjustment percentage for superplasticizers and apply it accurately.

Challenge and get performance evaluation