Practice Volume Of Cement (9.1) - Objectives of Mix Design - Civil Engineering Materials, Testing & Evaluation - Vol 2
Students

Academic Programs

AI-powered learning for grades 8-12, aligned with major curricula

Professional

Professional Courses

Industry-relevant training in Business, Technology, and Design

Games

Interactive Games

Fun games to boost memory, math, typing, and English skills

Volume of Cement

Practice - Volume of Cement

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions

Question 1 Easy

What is the water-cement ratio?

💡 Hint: Think about how water relates to cement in concrete.

Question 2 Easy

What influences the cement volume needed?

💡 Hint: Consider what affects concrete quality.

4 more questions available

Interactive Quizzes

Quick quizzes to reinforce your learning

Question 1

What is the maximum water-cement ratio for M30 grade as per IS 456:2000?

0.40
0.45
0.50

💡 Hint: Refer to IS 456:2000 for the grade specifications.

Question 2

True or False: Specific gravity is not needed in cement calculation.

True
False

💡 Hint: Remember how we calculate mass from volume.

1 more question available

Challenge Problems

Push your limits with advanced challenges

Challenge 1 Hard

Given a batch with 175 kg water and a W/C ratio of 0.40, calculate the required cement mass. Adjust for a scenario where aggregates have 5% free moisture.

💡 Hint: Consider how the moisture affects your water input.

Challenge 2 Hard

You have 0.1 m³ of cement with a specific gravity of 3.1 and must find out how much weight this cement represents. Next, discuss how this impacts your mix design.

💡 Hint: Applying the volume to mass conversion is key; think about the whole mix.

Get performance evaluation

Reference links

Supplementary resources to enhance your learning experience.