Practice Demoulding and Finishing - 3.5 | 27. Overview of Precast Concrete Construction | Civil Engineering Materials, Testing & Evaluation - Vol 2
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

3.5 - Demoulding and Finishing

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is the main reason for timing the demoulding process?

💡 Hint: Think about the consequences of removing an element too early.

Question 2

Easy

List two types of finishes used for precast concrete surfaces.

💡 Hint: Recall the different surface appearances we discussed.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

Why is it important to wait before demoulding concrete?

  • To achieve aesthetic value
  • To ensure it has adequate strength
  • To reduce costs

💡 Hint: Think about what could happen if it isn't strong enough.

Question 2

True or False: A textured finish may improve grip for walking surfaces.

  • True
  • False

💡 Hint: Recall the functions of different finishes.

Solve 1 more question and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

Evaluate the pros and cons of using acid-etched finishes versus painted finishes for urban infrastructure elements. Which would you prefer and why?

💡 Hint: Consider longevity and maintenance when weighing the two options.

Question 2

Design a testing plan for determining the optimal demoulding time for a particular variety of concrete used in precast elements. What parameters would you measure?

💡 Hint: Think about how you assess whether concrete is ready to demould.

Challenge and get performance evaluation