Practice Preparation and Placement Methods - 22.6 | 22. Special Concrete and Concreting Methods – Polymer-Modified Concrete | Civil Engineering Materials, Testing & Evaluation - Vol 2
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

22.6 - Preparation and Placement Methods

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What are the three main aspects of surface preparation?

💡 Hint: Remember the acronym C.R.S.

Question 2

Easy

Why is it important to mix polymer latex with water first?

💡 Hint: Think about how to achieve homogeneity.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the primary reason for surface preparation in PMC?

  • To make it visually appealing
  • To enhance bonding
  • To reduce cost

💡 Hint: Think about adherence.

Question 2

True or False: Moist curing is always necessary for Polymer-Modified Concrete.

  • True
  • False

💡 Hint: Consider the role of polymers.

Solve 2 more questions and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

Explain how improperly mixed Polymer-Modified Concrete could affect long-term durability and performance in a specific application.

💡 Hint: Consider the consequences of poor mechanical properties.

Question 2

Propose a detailed plan for the surface preparation of an existing concrete slab before applying PMC for a renovation project.
Outline specific steps, equipment, and potential challenges.

💡 Hint: Think about the tools needed and the conditions to monitor.

Challenge and get performance evaluation