Practice Duration of Curing - 7.3 | 14. Batching of Concrete | Concrete Technology
Students

Academic Programs

AI-powered learning for grades 8-12, aligned with major curricula

Professional

Professional Courses

Industry-relevant training in Business, Technology, and Design

Games

Interactive Games

Fun games to boost memory, math, typing, and English skills

Duration of Curing

7.3 - Duration of Curing

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions

Question 1 Easy

What is the minimum curing duration for ordinary Portland cement?

💡 Hint: Refer to the curing guidelines for ordinary cement.

Question 2 Easy

Name one method of curing concrete.

💡 Hint: Think of how we can keep concrete wet during curing.

4 more questions available

Interactive Quizzes

Quick quizzes to reinforce your learning

Question 1

What is the minimum curing period for blended cement?

3 days
7 days
10-14 days

💡 Hint: Think of the time required for different cement types.

Question 2

Curing is essential primarily to prevent which of the following?

True - Cracking
False - Cracking

💡 Hint: Consider what happens to concrete without proper curing.

Get performance evaluation

Challenge Problems

Push your limits with advanced challenges

Challenge 1 Hard

A construction team is using blended cement for a project. They are working in a region with colder weather. Calculate the optimal curing time they should adopt for the best durability.

💡 Hint: Consider how temperature impacts cement hydration rates.

Challenge 2 Hard

Evaluate the effect of omitting curing on a concrete slab made of ordinary Portland cement versus blended cement.

💡 Hint: Think about the properties of both types of cement and hydration needs.

Get performance evaluation

Reference links

Supplementary resources to enhance your learning experience.