5.2 - Curing Duration
Enroll to start learning
You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.
Practice Questions
Test your understanding with targeted questions
What is curing in concrete?
💡 Hint: Think about how we keep concrete hydrated.
Why is the water-binder ratio important?
💡 Hint: Consider how water interacts with cement.
4 more questions available
Interactive Quizzes
Quick quizzes to reinforce your learning
What is the recommended curing time for silica fume concrete?
💡 Hint: Think about the specifics shared in class.
True or False: Curing is optional for High Performance Concrete.
💡 Hint: Reflect on why we discussed the importance of curing.
1 more question available
Challenge Problems
Push your limits with advanced challenges
Given that a project requires HPC for a marine structure, detail a curing plan that meets the 14-day requirement. Include methods, timing, and resources needed.
💡 Hint: Think about different environmental factors that could affect your curing plan.
Critique the effects of using a water-binder ratio greater than 0.35 in HPC curing. What long-term effects could arise?
💡 Hint: Reflect on how hydration affects concrete structure.
Get performance evaluation
Reference links
Supplementary resources to enhance your learning experience.