12 - Case Studies of Concrete Durability Failures
Enroll to start learning
You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.
Practice Questions
Test your understanding with targeted questions
What is a water-cement ratio?
💡 Hint: Consider how the ratio affects strength.
Why is curing important?
💡 Hint: Think about what happens if concrete is too dry.
4 more questions available
Interactive Quizzes
Quick quizzes to reinforce your learning
What was a major cause of premature corrosion in the marine bridge pilings?
💡 Hint: Think about protective measures.
True or False: Adequate curing is not necessary for concrete durability.
💡 Hint: Consider the hydration process.
1 more question available
Challenge Problems
Push your limits with advanced challenges
A new marine bridge is being constructed. Design a protocol for ensuring adequate cover and the correct water-cement ratio to prevent corrosion.
💡 Hint: Focus on environmental exposure.
During a site inspection, you find evidence of surface dusting on a slab. Propose a corrective action plan.
💡 Hint: Consider effects of moisture during finishing.
Get performance evaluation
Reference links
Supplementary resources to enhance your learning experience.