Practice Case Studies on Concrete Durability Failures - 11.11 | 11. Durability of Concrete | Concrete Technology
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

11.11 - Case Studies on Concrete Durability Failures

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What causes corrosion in concrete structures?

💡 Hint: Think about environmental factors affecting metals.

Question 2

Easy

What is ASR?

💡 Hint: Recall any chemical reaction that leads to cracks.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the primary cause of corrosion in concrete structures exposed to marine environments?

  • High alkalinity
  • Moisture and chlorides
  • Low temperature

💡 Hint: Consider the factors in marine environments.

Question 2

True or False: ASR causes extensive cracking due to the reaction of non-reactive aggregates.

  • True
  • False

💡 Hint: Focus on the type of aggregates involved.

Solve 1 more question and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

Design a concrete mix for a marine environment, considering corrosion resistance. Explain your choice of materials.

💡 Hint: Think about how different materials interact with the environment.

Question 2

Discuss the implications of failing to consider ASR in a new construction project and derive a strategy to mitigate this risk.

💡 Hint: Assess the risks and preventive measures for all phases of construction.

Challenge and get performance evaluation