Practice Special High Wear Items Costs - 6.3 | 11. Fuel Consumption Rates for Different Engine Types | Construction Engineering & Management - Vol 1
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

6.3 - Special High Wear Items Costs

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is the fuel consumption rate for a gasoline engine under standard conditions?

💡 Hint: Think of the values we discussed regarding engines.

Question 2

Easy

Name one example of a high wear item.

💡 Hint: Recall the components that need frequent replacement.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the theoretical fuel consumption for a diesel engine?

  • 0.06 gallons
  • 0.04 gallons
  • 0.125 liters

💡 Hint: Think about the specific types of engines discussed.

Question 2

True or False: High wear items are rarely replaced as they have long lifespans.

  • True
  • False

💡 Hint: Recall the discussion on replacement frequencies.

Solve and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

A loader operates with a horsepower of 250, consumes 0.2 gallons per horsepower hour, and fuel costs 50 rupees per gallon. Find the hourly fuel cost.

💡 Hint: Don't forget to break it into easy steps!

Question 2

Given a bulldozer cutting edge costs 2000 rupees and has an expected life of 500 hours, calculate the hourly cost of replacing the cutting edge.

💡 Hint: Think about how often you need to replace high wear items.

Challenge and get performance evaluation