Practice Outline of Today's Presentation - 2.2 | Getting Started 14 | Construction Engineering & Management - Vol 1
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

Name one basic step in earthmoving operations.

💡 Hint: Think about what happens before digging.

Question 2

Easy

What is haul distance?

💡 Hint: Consider how far you need to move the earth.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the economic haul distance for a bulldozer?

  • 50 meters
  • 100 meters
  • 150 meters

💡 Hint: Consider the information provided about bulldozer efficiency.

Question 2

True or False: Grade resistance only occurs when moving downhill.

  • True
  • False

💡 Hint: Think about how machines perform on different slopes.

Solve and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

Calculate the total tractive effort for a bulldozer with a gross weight of 25 tons on a poorly maintained earthen road, given a rolling resistance of 75 kg/ton and a 4 cm penetration.

💡 Hint: Consider both the base rolling resistance and the additional effort due to sinking.

Question 2

Design a small experiment to compare the actual power consumption of two types of earthmoving equipment over a fixed distance of 100 meters.

💡 Hint: Think about controlling variables to ensure a fair test.

Challenge and get performance evaluation