3.2 - Fixed & Variable Time
Enroll to start learning
You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.
Practice Questions
Test your understanding with targeted questions
What is a bucket fill factor?
💡 Hint: Think about how different materials might fill a bucket.
Define static tipping load.
💡 Hint: Remember the risk of tipping!
4 more questions available
Interactive Quizzes
Quick quizzes to reinforce your learning
What is the purpose of a bucket fill factor?
💡 Hint: Remember, it changes with the material type.
True or False: Fixed time includes the time taken for travel between locations.
💡 Hint: Think about what fixed means.
1 more question available
Challenge Problems
Push your limits with advanced challenges
Calculate the production rate of a wheel loader with a heaped capacity of 3.5 m³, fill factor of 80%, a fixed cycle time of 25 seconds, and unit weight of 1500 kg/m³ for the material.
💡 Hint: Remember to convert seconds into hours for the production calculation.
If a loader's tipping load is 10,000 kg and it exceeds the load by 20%, what are the safety implications?
💡 Hint: Consider how safety protocols are essential for operational management.