Practice Fixed & Variable Time - 3.2 | 12. Bucket Ratings and Capacity | Construction Engineering & Management - Vol 2
Students

Academic Programs

AI-powered learning for grades 8-12, aligned with major curricula

Professional

Professional Courses

Industry-relevant training in Business, Technology, and Design

Games

Interactive Games

Fun games to boost memory, math, typing, and English skills

Fixed & Variable Time

3.2 - Fixed & Variable Time

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions

Question 1 Easy

What is a bucket fill factor?

💡 Hint: Think about how different materials might fill a bucket.

Question 2 Easy

Define static tipping load.

💡 Hint: Remember the risk of tipping!

4 more questions available

Interactive Quizzes

Quick quizzes to reinforce your learning

Question 1

What is the purpose of a bucket fill factor?

To increase load capacity
To adjust the rated capacity based on material type
To determine tipping load

💡 Hint: Remember, it changes with the material type.

Question 2

True or False: Fixed time includes the time taken for travel between locations.

True
False

💡 Hint: Think about what fixed means.

1 more question available

Challenge Problems

Push your limits with advanced challenges

Challenge 1 Hard

Calculate the production rate of a wheel loader with a heaped capacity of 3.5 m³, fill factor of 80%, a fixed cycle time of 25 seconds, and unit weight of 1500 kg/m³ for the material.

💡 Hint: Remember to convert seconds into hours for the production calculation.

Challenge 2 Hard

If a loader's tipping load is 10,000 kg and it exceeds the load by 20%, what are the safety implications?

💡 Hint: Consider how safety protocols are essential for operational management.

Get performance evaluation

Reference links

Supplementary resources to enhance your learning experience.