4.1 - Formula for Productivity
Enroll to start learning
You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.
Interactive Audio Lesson
Listen to a student-teacher conversation explaining the topic in a relatable way.
Understanding Bucket Ratings
🔒 Unlock Audio Lesson
Sign up and enroll to listen to this audio lesson
Today, we will start discussing bucket ratings. Can anyone tell me what they think a bucket rating might involve?
Is it about how much material the bucket can hold?
Exactly, it's about the heaped capacity, which is standardized by manufacturers. This capacity is measured for specific materials at a standard angle of repose.
But what if the material at my site is different from what they used for the rating?
Great question! In that case, we must apply a correction factor to the rated bucket volume based on the material type and its filling ability.
So, if I'm working with sand, it fills differently than coarse aggregates?
Exactly, sand typically has a better filling ability than coarse aggregate, so those factors must be considered in our calculations.
To remember this, think of the acronym FILL (Filling, Impact, Loader, Load) which highlights crucial aspects to consider when assessing loader capabilities.
Let's summarize: bucket ratings are crucial and must be adjusted for specific materials to ensure accurate productivity estimation.
Stability Checks and Payload Weight
🔒 Unlock Audio Lesson
Sign up and enroll to listen to this audio lesson
Now, let's talk about stability checks. Why do you think checking the weight in a loader bucket is important?
Isn't it to avoid tipping over?
Exactly! Overloading can cause instability. We need to ensure the load is within the static tipping load defined by the manufacturer.
What exactly is static tipping load?
Static tipping load is the weight that, when exceeded, causes the rear wheel to lift off the ground, indicating a risk of tipping.
How do we determine if we’re within the safe load limits?
Great question! We start by finding 50% of the full-turn static tipping load for wheel loaders, ensuring our load does not exceed this value.
To help remember this concept, think of the phrase 'Weigh to Stay,' highlighting the importance of weight checks for stability.
In summary, always verify the bucket load against the static tipping load to maintain safety and stability.
Production Cycle Calculation
🔒 Unlock Audio Lesson
Sign up and enroll to listen to this audio lesson
Let’s explore how the production cycle is calculated. Who can tell me what components of time are involved in a loader's production cycle?
Is it fixed time and variable time?
Spot on! Fixed time includes loading, dumping, and maneuvering, while variable time depends on haul distance.
Why does the haul distance matter?
Because longer distances increase travel time, affecting productivity. So, we add fixed and variable times to find total cycle time.
And what is the formula for calculating productivity?
Great question! Productivity can be calculated as the adjusted bucket volume divided by the total cycle time.
To remember this formula, think of the acronym MVP (Material, Volume, Production) which encapsulates key aspects of productivity calculation.
In summary, understanding both fixed and variable times, along with the productivity formula, is crucial for efficient loader operation.
Practical Application and Example
🔒 Unlock Audio Lesson
Sign up and enroll to listen to this audio lesson
Let’s look at a practical example to reinforce our learning. Who remembers how to calculate productivity based on an example?
We need the rated bucket capacity, fill factor, and total cycle time.
Correct! For example, if a wheel loader has a bucket capacity of 2.87 m³, with a fill factor of 85%, and a cycle time of 30 seconds, how would we approach this?
We’d multiply the bucket capacity by the fill factor and then calculate the productivity using total cycle time.
Exactly! And if the job efficiency is given as 45 minutes per hour, how do we incorporate that?
We convert the cycle time to hours and adjust the formula accordingly.
Exactly! Remember, practice helps reinforce these concepts. I recommend practicing calculations frequently. It helps!
In conclusion, illustrative examples enhance understanding, so apply these principles in real-world calculations!
Introduction & Overview
Read summaries of the section's main ideas at different levels of detail.
Quick Overview
Standard
The section explains how to adjust a loader's bucket capacity based on material type and loading conditions, emphasizing the importance of fill factors and stability checks to ensure operational safety and efficiency.
Detailed
Formula for Productivity
In this section, we explore the bucket ratings provided by manufacturers, which indicate the heaped capacity of buckets based on specific materials and angles of repose. It explains that although manufacturers provide standard ratings, actual site conditions may require adjustments based on the material being handled, such as sand or coarse aggregate which differ in filling ability.
Key Points
- Bucket Capacity and Fill Factor: The manufacturer's rated bucket volume is adjusted by a fill factor that accounts for the type of material being loaded and the machine's mounting style (track-mounted vs wheel-mounted). This fill factor is essential for accurately estimating the loader's productivity.
- Stability and Payload Weight: It emphasizes the importance of checking the payload weight, particularly for front-end loaders, as overloading can lead to instability or tipping. The static tipping load defined by the manufacturer must be observed during operation.
- Production Cycle and Calculation: The section describes the production cycle of a loader, which includes fixed and variable time components affecting overall productivity. The total cycle time is calculated by adding fixed time (loader operations) to variable time (haul distance). The productivity is determined using a formula that incorporates the heaped bucket capacity adjusted by the fill factor and divided by the total cycle time.
- Illustration Example: A practical example is provided where the potential production in kg is calculated for a wheel loader, reinforcing the theoretical concepts with real computation.
This comprehensive analysis of bucket ratings, filling ability, stability checks, and production calculations forms a foundational understanding of loader productivity.
Audio Book
Dive deep into the subject with an immersive audiobook experience.
Understanding Bucket Ratings
Chapter 1 of 10
🔒 Unlock Audio Chapter
Sign up and enroll to access the full audio experience
Chapter Content
Now, let us see about the bucket ratings, see the manufacturer provide you the information on what is the heaped capacity of the bucket. So, this bucket rating is done by the manufacturer in a standard manner with a particular material, say they heap the material at a standard angle of repose say is 2 to 1 and then rate the bucket based on that. So, that bucket rating, we are going to use it for the estimation of the productivity of the loader.
Detailed Explanation
Bucket ratings are important for understanding how much material a loader can handle. Manufacturers define this capacity using specific standards, such as the angle at which material can be heaped into the bucket. This heaped capacity will help in estimating how productive the loader is for the work at hand.
Examples & Analogies
Imagine trying to fill a basket with fruits. If you pile the fruits too steeply, they will tumble over. But if you stack them neatly according to guidelines provided by the basket manufacturer, you'll make the most of the basket's capacity without wasting space.
Impact of Material Type on Bucket Capacity
Chapter 2 of 10
🔒 Unlock Audio Chapter
Sign up and enroll to access the full audio experience
Chapter Content
So, but in your actual project site, the material which you are going to handle that may be of different from the material which was used for the rating of the bucket by the manufacturer. So, you know that different material will have different filling ability. Say for example, we are going to handle sand. Sand has a particular filling ability, if we compare sand and if you compare the coarse aggregate, if you compare bigger size coarse aggregate, sand has better filling ability when compared to the coarse aggregate.
Detailed Explanation
Different materials have different properties, which means they fill the bucket differently. For example, sand can be compacted more than larger pieces of aggregate. This variability affects how much material the loader can effectively carry, thus requiring adjustments based on material type.
Examples & Analogies
Think of packing a suitcase. If you try to pack soft clothes, you can fit in more compared to packing harder items like shoes. The nature of the material greatly influences how much can actually fit into a limited space.
Applying Correction Factors
Chapter 3 of 10
🔒 Unlock Audio Chapter
Sign up and enroll to access the full audio experience
Chapter Content
So, that is why according to the material which you are going to handle at your project site you have to apply the correction factor to the rated bucket volume by the manufacturer.
Detailed Explanation
To accurately estimate how much the loader can carry for a specific job, a correction factor must be applied to the manufacturer's rated bucket volume. This factor accounts for the characteristics of the material being handled, ensuring more accurate estimates of the loader's productivity.
Examples & Analogies
Similar to adjusting a recipe based on the ingredients you have at home: if original instructions call for a large egg, but you only have small ones, you might need to change the amount of other ingredients to maintain the right consistency.
Loader Mounting Type and Its Effect
Chapter 4 of 10
🔒 Unlock Audio Chapter
Sign up and enroll to access the full audio experience
Chapter Content
So, it not only depends upon the material type, it also depends upon the mounting of your machine. So, your machine will be either wheel mounted or it can be either track mounted. So, generally as you know, the track mounted machine will give you better tractive effort, it will be able to generate more amount of breakout force.
Detailed Explanation
The type of mounting (wheel or track) also influences how effectively the loader can fill its bucket. Track-mounted loaders generally provide better force to pick up materials compared to wheel-mounted loaders, affecting their productivity.
Examples & Analogies
Imagine a car versus a bulldozer when it comes to pulling a heavy load. A bulldozer, with its tracks, can grip better on rough terrain, compared to a car which might struggle. In heavy lifting, equipment designed for the job outperforms standard vehicles.
Bucket Fill Factor Adjustments
Chapter 5 of 10
🔒 Unlock Audio Chapter
Sign up and enroll to access the full audio experience
Chapter Content
So, the bucket fill factor will also vary. So, it not only depends upon the material type, it also depends upon the mounting of your machine...the type of mounting will also affect the bucket fill factor.
Detailed Explanation
The bucket fill factor quantifies how effectively the bucket can be filled based on both material type and loader mounting type. Each combination will lead to different fill factors that need to be applied for accurate volume calculations.
Examples & Analogies
It’s like how much water you can get in a cup - if it's a tall, narrow cup (wheel loader) versus a wide, shallow bowl (tracked loader), the volume of water you can pour in will vary even if you have the same total amount available to pour.
Importance of Stability in Loaders
Chapter 6 of 10
🔒 Unlock Audio Chapter
Sign up and enroll to access the full audio experience
Chapter Content
Now another important thing which we need to check particularly for the front end loaders is way to check for a payload weight from the stability point of view...we have to check for the payload weight.
Detailed Explanation
Stability is crucial for loader operation, especially while moving fully-loaded buckets. Overloading could risk tipping, so it's necessary to ensure that payload weights remain within safe limits recommended by manufacturers.
Examples & Analogies
Consider riding a bike: carrying a heavy backpack can shift your balance. Similarly, ensuring the loader's load doesn't exceed stability limits helps prevent accidents and maintain safe operation.
Calculating Static Tipping Load
Chapter 7 of 10
🔒 Unlock Audio Chapter
Sign up and enroll to access the full audio experience
Chapter Content
So, this static tipping load is determined by the manufacturer under standard conditions...how much load we need to add into the bucket which will cause the lifting of the rear view of the ground that is called as a tipping load.
Detailed Explanation
Manufacturers test loaders to find the static tipping load, which is the maximum weight that can be safely lifted without tipping. It is essential to know this limit to prevent accidents and ensure safe operation while using the loader.
Examples & Analogies
This is similar to using a seesaw. If you add weight to one side beyond its capacity, it tips over. Knowing the tipping point is essential to maintaining balance, much like how loaders must operate within their tipping load for safety.
Tipping Load Guidelines
Chapter 8 of 10
🔒 Unlock Audio Chapter
Sign up and enroll to access the full audio experience
Chapter Content
As per the guidelines, the permitted operating load for a wheel loader is your load in the bucket should be within 50% of the full turn static tipping load...this is very much less I mean this is less than the permitted operating load.
Detailed Explanation
When using a wheel loader, the actual load must remain below 50% of the tipping load to keep safe. Calculating these limits ensures that the machine operates within safe and effective parameters.
Examples & Analogies
Think of it as setting a speed limit while driving; going beyond can put you and others in danger. In loaders, respecting these weight limits helps maintain safety and stability while operating.
Defining Production Cycle
Chapter 9 of 10
🔒 Unlock Audio Chapter
Sign up and enroll to access the full audio experience
Chapter Content
Now let us define what is the production cycle of the loader? So, what are all the components of the production cycle as we discussed earlier the same way we can split the production cycle time into 2 components...
Detailed Explanation
The production cycle for a loader can be broken into fixed and variable times. Fixed time does not depend on distance, while variable time is influenced by haul distances and speed. Both components are crucial for estimating operational efficiency.
Examples & Analogies
Think of baking a cake: some steps like mixing ingredients take a fixed amount of time (fixed time) regardless of the oven distance, while baking may take shorter or longer depending on how hot your oven is (variable time).
Estimating Loader Productivity
Chapter 10 of 10
🔒 Unlock Audio Chapter
Sign up and enroll to access the full audio experience
Chapter Content
So, the productivity can be represented by the following equation: ...Productivity (lc-m/hr) = Total cycle time.
Detailed Explanation
Finally, productivity is calculated using the heaped capacity adjusted by the bucket fill factor divided by the total cycle time. This equation gives insights into how effectively the loader can perform over a working hour.
Examples & Analogies
Imagine a factory assembly line. Just as line speed and worker efficiency determine how many products are made in an hour, for loaders, bucket capacity and cycle time dictate their productivity.
Key Concepts
-
Heaped Capacity: The total volume a loader's bucket can carry when filled according to manufacturer's specifications.
-
Filling Ability: The capacity of materials like sand or aggregate to fill the loader bucket effectively.
-
Fill Factor: An adjustment value applied to bucket capacity based on material characteristics.
-
Static Tipping Load: A limit that dictates payload weight to ensure machine stability and safety.
-
Total Cycle Time: The sum of fixed and variable time components in the loader's operation.
Examples & Applications
For a loader with a rated bucket capacity of 2.87 m³ and a fill factor of 85%, the actual usable volume would be 2.44 m³.
In a scenario where a wheel loader is used to transport asphalt with a unit weight of 1700 kg/m³, the weight estimation using a bucket with a fill factor of 75% will differ in output compared to a denser material like stone.
Memory Aids
Interactive tools to help you remember key concepts
Rhymes
If the bucket's not right, the loads may cause fright; adjust it with care, or you'll face a nightmare!
Stories
Imagine a construction site where a loader filled with too much sand tips over. The workers learn to always check the load before moving, ensuring safety.
Memory Tools
Remember 'FILL' for Filling, Impact, Loader, Load as key factors to evaluate when using loaders.
Acronyms
Use MVP (Material, Volume, Production) to remind yourself of the key steps in calculating productivity.
Flash Cards
Glossary
- Bucket Rating
The manufacturer's specification of a bucket's heaped capacity based on specific materials and conditions.
- Bucket Fill Factor
A multiplication factor applied to the rated bucket volume, accounting for the effective fill based on material type.
- Static Tipping Load
The weight threshold at which a machine's rear wheel lifts off the ground, indicating a risk of tipping.
- Production Cycle
The total time taken for loading, transporting, and unloading material, comprising fixed and variable components.
Reference links
Supplementary resources to enhance your learning experience.