Practice Static Tipping Load - 2.3 | 12. Bucket Ratings and Capacity | Construction Engineering & Management - Vol 2
Students

Academic Programs

AI-powered learning for grades 8-12, aligned with major curricula

Professional

Professional Courses

Industry-relevant training in Business, Technology, and Design

Games

Interactive Games

Fun games to boost memory, math, typing, and English skills

Static Tipping Load

2.3 - Static Tipping Load

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions

Question 1 Easy

What is the fill factor?

💡 Hint: Think about the efficiency of different materials.

Question 2 Easy

What is static tipping load?

💡 Hint: Consider the weight limits of a loader.

4 more questions available

Interactive Quizzes

Quick quizzes to reinforce your learning

Question 1

What is a fill factor in loader operations?

A ratio for bucket efficiency
A safety measure
Loader size

💡 Hint: Consider different materials and their packing properties.

Question 2

True or False: The operating load of a loader can exceed 50% of its static tipping load.

True
False

💡 Hint: Keep safety principles in mind.

Get performance evaluation

Challenge Problems

Push your limits with advanced challenges

Challenge 1 Hard

A loader has a full tipping load of 10,000 kg. If using a fill factor of 0.8, what's the maximum weight that can safely be loaded?

💡 Hint: Remember to apply fill factor to the tipping load.

Challenge 2 Hard

A tracked loader has a static tipping load of 12,000 kg. Calculate the maximum operating load.

💡 Hint: Refer to the specified percentage for mounted types.

Get performance evaluation

Reference links

Supplementary resources to enhance your learning experience.