Practice Analysis of 5 Scrapers - 1.1 | 10. Introduction to Scraper Economics | Construction Engineering & Management - Vol 2
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

Define what a scraper does in construction.

💡 Hint: Consider its role in material handling.

Question 2

Easy

What is cycle time?

💡 Hint: Think of the entire operation process.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the primary function of scrapers in construction?

  • Loading soil
  • Transporting cement
  • Excavating foundations

💡 Hint: Think about the materials typically handled by these machines.

Question 2

True or False: Having more scrapers always reduces production costs.

  • True
  • False

💡 Hint: Consider the relationship between cost, efficiency, and productivity.

Solve and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

Given that four scrapers yield a production of 500 bcm per hour and the cost per cubic meter is ₹50. Calculate the new cost per cubic meter if the number of scrapers is increased to six and output increases by 20%.

💡 Hint: Think of how the productivity increases impacts the overall cost.

Question 2

If the hourly cost of operating a scraper is ₹4500 and a pusher is ₹5600, calculate the total operational cost if you are using 5 scrapers and 1 pusher for one hour.

💡 Hint: Break down each component of the operational cost for clarity.