Test your understanding with targeted questions related to the topic.
Question 1
Easy
Calculate the production of five scrapers given their productivity is 636.89 bank cubic meters.
💡 Hint: Refer to the definitions provided in the glossary.
Question 2
Easy
What is the unit cost for five scrapers using the total cost of ₹44.12?
💡 Hint: Break down the total cost into per unit production as explained.
Practice 4 more questions and get performance evaluation
Engage in quick quizzes to reinforce what you've learned and check your comprehension.
Question 1
What is the productivity rate for five scrapers?
💡 Hint: Refer back to the productivity calculations in the section.
Question 2
Is it true that using six scrapers will always be more cost-effective?
💡 Hint: Think about the relationship between cost and output.
Solve 1 more question and get performance evaluation
Push your limits with challenges.
Question 1
Calculate the total cost and unit cost if we switch from five to six scrapers while keeping the same pusher.
💡 Hint: Use the same formula for calculating costs.
Question 2
Analyze why it might be beneficial to reduce scrapers and enhance pusher capacity instead.
💡 Hint: Think about the relationship between scrapers and production flow.
Challenge and get performance evaluation