2.1 - Cost Calculation for 5 Scrapers
Enroll to start learning
You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.
Practice Questions
Test your understanding with targeted questions
Calculate the production of five scrapers given their productivity is 636.89 bank cubic meters.
💡 Hint: Refer to the definitions provided in the glossary.
What is the unit cost for five scrapers using the total cost of ₹44.12?
💡 Hint: Break down the total cost into per unit production as explained.
4 more questions available
Interactive Quizzes
Quick quizzes to reinforce your learning
What is the productivity rate for five scrapers?
💡 Hint: Refer back to the productivity calculations in the section.
Is it true that using six scrapers will always be more cost-effective?
💡 Hint: Think about the relationship between cost and output.
1 more question available
Challenge Problems
Push your limits with advanced challenges
Calculate the total cost and unit cost if we switch from five to six scrapers while keeping the same pusher.
💡 Hint: Use the same formula for calculating costs.
Analyze why it might be beneficial to reduce scrapers and enhance pusher capacity instead.
💡 Hint: Think about the relationship between scrapers and production flow.
Get performance evaluation
Reference links
Supplementary resources to enhance your learning experience.