Practice Required Rimpull Calculation - 3.5 | 10. Introduction to Scraper Economics | Construction Engineering & Management - Vol 2
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What does rimpull refer to?

💡 Hint: Think about the wheeled machines and their power.

Question 2

Easy

What is the coefficient of traction?

💡 Hint: Consider how well a machine can grip the ground.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

The maximum usable rimpull depends on which of the following factors?

  • Weight on powered wheels
  • Machine Color
  • Engine Size

💡 Hint: Think about what allows a machine to provide effective pulling force.

Question 2

True or False: The more scrapers used in a project will always improve productivity.

  • True
  • False

💡 Hint: Consider the dynamics between scrapers and pushers in operations.

Solve 1 more question and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

A project manager considers using different numbers of scrapers ranging from 4 to 7 with pushers always at one. Calculate expected productivity for each case and determine the best choice.

💡 Hint: Make sure to factor in efficiency and each specific scraper's cycle time.

Question 2

A scraper operates at various altitudes. Calculate the adjusted rimpull if it starts at sea level and rises to 1200 meters.

💡 Hint: Work through the altitude increments methodically, keeping track of performance drops.

Challenge and get performance evaluation