Practice Rimpull and Performance Analysis - 3 | 10. Introduction to Scraper Economics | Construction Engineering & Management - Vol 2
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is rimpull?

💡 Hint: Think of it as the pulling strength of the machine.

Question 2

Easy

How is the productivity of a scraper calculated?

💡 Hint: Remember the formula includes the number of scrapers and their efficiencies.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the productivity rate achieved with five scrapers?

  • 636.89 bank cubic meters/hour
  • 723.36 bank cubic meters/hour
  • 500 bank cubic meters/hour

💡 Hint: Review the production calculations from the section.

Question 2

Is rimpull essential for the performance of a scraper?

  • True
  • False

💡 Hint: Think about the forces involved in scraper operation.

Solve 1 more question and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

Calculate the maximum usable rimpull for a scraper with a gross weight of 80,000 kg and a coefficient of traction of 0.6. Assume 50% weight on powered wheels.

💡 Hint: Be sure to calculate the weight on the drive wheels before determining usable rimpull.

Question 2

If a scraper can produce 700 bank cubic meters/hour and the cost per unit is ₹50, what would be the total cost of moving 1,400 bank cubic meters?

💡 Hint: Think about how to correlate total volume with cost.

Challenge and get performance evaluation