Balancing Interdependent Machines

4 - Balancing Interdependent Machines

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions

Question 1 Easy

What does gravimetric capacity refer to?

💡 Hint: Think about the manufacturer's specifications.

Question 2 Easy

Why is it important to check the load weight against the gravimetric capacity?

💡 Hint: Consider the consequences of exceeding limits.

4 more questions available

Interactive Quizzes

Quick quizzes to reinforce your learning

Question 1

What is the gravimetric capacity?

Maximum safe load of a machine
Total weight of materials
The speed at which materials are processed

💡 Hint: Think about safety limits within machine operations.

Question 2

True or False: Overloading a truck increases productivity.

True
False

💡 Hint: Consider long-term effects of overloading.

1 more question available

Challenge Problems

Push your limits with advanced challenges

Challenge 1 Hard

A project requires a loader operating at 4 bucket loads for a truck that has a capacity of 8.5 m³, adjusted for a 0.85 fill factor. Calculate the number of trucks needed if the excavator has a cycle time of 1.5 minutes and the truck cycle time is 30 minutes.

💡 Hint: Adjust the truck capacity and use the provided cycle times.

Challenge 2 Hard

Discuss the long-term effects of continuously overloading a truck on operational costs and productivity. Use specific cost percentages if applicable.

💡 Hint: Reflect on the implications beyond immediate productivity gains.