Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.
Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.
Enroll to start learning
You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.
Test your understanding with targeted questions related to the topic.
Question 1
Easy
What does gravimetric capacity mean?
💡 Hint: Think about safety limits provided by manufacturers.
Question 2
Easy
How do you calculate loading time?
💡 Hint: Remember the formula we discussed.
Practice 4 more questions and get performance evaluation
Engage in quick quizzes to reinforce what you've learned and check your comprehension.
Question 1
What is the loading time calculated by?
💡 Hint: Think about how we determine the time to load a truck.
Question 2
True or False: Balancing the number of trucks with excavators is not important.
💡 Hint: Consider why coordination between machines matter in construction.
Solve and get performance evaluation
Push your limits with challenges.
Question 1
Calculate how many bucket loads are needed if a truck capacity is 12 m3 and bucket capacity is 2.5 m3 with a fill factor of 0.85. What lead to increased truck production?
💡 Hint: Remember to adjust the capacities based on their fill factors.
Question 2
A loader operates on a job efficiency of 45 mins per hour. If a truck can carry 15 m3 and the loading cycle is 10 minutes, how many truckloads can they efficiently output in 1 hour?
💡 Hint: Factor in job efficiency in timing calculations.
Challenge and get performance evaluation