Practice Factors Affecting Dumping Time - 2.1 | 16. Loading Time and Gravimetric Capacity | Construction Engineering & Management - Vol 2
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is gravimetric capacity?

💡 Hint: Consider the manufacturer's specifications.

Question 2

Easy

Name a type of dump truck.

💡 Hint: Think about different unloading methods.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the maximum weight limit for operational machinery called?

  • Gravimetric Capacity
  • Dumping Efficiency
  • Material Density

💡 Hint: It's essential for safety and performance.

Question 2

True or False: Overloading a truck does not affect its operational cost.

  • True
  • False

💡 Hint: Consider the consequences of machine abuse.

Solve 2 more questions and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

You have two types of materials: A (light and easy to dump) and B (heavy and sticky). If A takes 5 minutes to unload and B takes twice that time, calculate the time taken to dump 10 loads of each.

💡 Hint: Break it down by material type and remember the time per load.

Question 2

During a project, trucks are often idling due to congestion caused by three bulldozers at a dumping site. If the idle time per truck is 10 minutes, calculate the impact on overall productivity if 4 trucks are involved over an hour.

💡 Hint: Multiply the number of trucks by idle time to find total impact on productivity.

Challenge and get performance evaluation